  • A platform has a rated capacity of 240 kg. The operator weighs 88 kg, and each bucket weighs 16 kg. What is the maximum number of whole buckets that can be carried?
  • If an EWP comes into contact with powerlines, what should be done first?
  • What should an operator confirm when checking an EWP logbook?
  • When setting up an elevating work platform near a building, which hidden site condition should be checked because it could affect ground stability?
  • Which combination includes the identified controls for protecting pedestrians near EWP operations?
  • A platform has a maximum capacity of 275 kg. You weigh 85 kg, and each bucket of bolts weighs 17.5 kg. What is the maximum number of whole buckets you can carry?
  • Before operating an EWP on a busy street, what should be confirmed with the local authorities?
  • Which group contains only common workplace hazards for EWP operations?
  • What is a key reason to consult relevant people before EWP work begins?
  • Why should an operator avoid raising or lowering an EWP boom over a person?
  • What is an appropriate immediate response if an EWP basket suddenly drops unexpectedly?
  • What should an operator confirm about defects recorded in an EWP logbook?
  • What should an operator look for when inspecting EWP wiring?
  • Which observation may indicate structural damage to an EWP?
  • What is the live load of an EWP?
  • What is the minimum working distance from an overhead powerline rated up to 132 kV?
  • When should the communication method between an EWP operator and the team be selected?
  • Which condition is an example of an unstable-ground hazard for an EWP?
  • A worker weighing 85 kg is using a platform rated for 275 kg. If each box weighs 20 kg, what is the maximum number of whole boxes that can be carried?
  • Which task is a suitable use of an EWP’s ground controls?
  • What should an EWP operator do after receiving an unclear signal during operation?
  • What should happen to EWP operation when the deadman control is not activated?
  • Which setup measure helps protect people near an EWP work area?
  • Which practice helps improve visibility and safety when driving an EWP around a workplace?
  • If wind speed exceeds the manufacturer’s safe operating specification, which response is appropriate?
  • When may an out-of-service tag be removed from an EWP?
  • Two workers weighing 75 kg and 88 kg occupy an EWP rated for 250 kg. How much capacity remains for tools and materials?
  • Which set lists possible repercussions for failing to meet a high risk work licence holder’s duty of care?
  • What should be considered when checking the live load before raising an EWP basket?
  • An EWP platform can carry a total load of 275 kg. A worker weighs 85 kg, and each bucket weighs 17.5 kg. What is the maximum number of whole buckets that can be carried?
  • Which materials can help stabilise an EWP without outriggers on unstable ground?
  • When setting up near a trench, what minimum horizontal distance from the edge is indicated by a 1:1 rule?
  • Who should be consulted before beginning EWP operations at a worksite?
  • Which item is a pre-operation consideration rather than a workplace hazard?
  • If an EWP must work closer to powerlines than the minimum safe distance, what should be done?
  • An EWP has a rated capacity of 250 kg. The operator weighs 92 kg. How much additional load can be carried?
  • Which action best reflects a licence holder’s duty of care?
  • What is a hazard?
  • Which option lists suitable ways to check whether an EWP is level?
  • What minimum working distance applies to a powerline in the 132–330 kV category?
  • What does risk describe in relation to a hazard?
  • Which wheel condition should be checked during an EWP pre-start inspection?
  • Which clearance should be considered when planning the path of an EWP boom?
  • An operator and materials are carried in an EWP basket. How should their weight be classified?
  • Who is responsible for completing pre-start checks on an EWP?
  • A platform has a rated capacity of 260 kg. The operator weighs 80 kg, and each crate weighs 24 kg. What is the maximum number of whole crates that can be carried?
  • When moving an EWP around a workplace, what should be done about the intended travel path?
  • Which measure can help reduce the risk to people near an operating EWP?
  • Where can an operator find the maximum wind velocity for an EWP?
  • Which action is part of a high risk work licence holder’s duty of care?
  • Why should an EWP be tested through its full range of capabilities before use?
  • After stopping work because an EWP basket has dropped unexpectedly, what should happen to the machine?
  • A welder weighs 85 kg and carries 25 kg of tools and equipment. Each splice plate weighs 15.5 kg. If the basket capacity is 200 kg, how many plates can he carry at one time without exceeding capacity?
  • Which is an example of an overhead hazard when operating an EWP?
  • Which environmental condition should be considered when planning the path of an EWP boom?
  • Which items should be checked during an EWP pre-functional inspection?
  • Why should an operator continuously monitor basket and boom movements?
  • When assessing the ground for an EWP's planned travel or work path, what should be considered?
  • Where can an operator find the EWP’s maximum permitted wind speed?
  • Which group of conditions should be checked for hazards before raising an EWP boom or basket?
  • An EWP platform is rated for 195 kg. The worker weighs 89 kg, and tools already on the platform weigh 106 kg. How much capacity remains for any further load?
  • An EWP has a maximum rated capacity of 225 kg. What does this limit apply to?
  • Before raising an EWP boom, what should be confirmed about fall protection?
  • How should the voltage of overhead powerlines be confirmed?
  • An EWP platform has a rated capacity of 195 kg. If you weigh 89 kg, what is the maximum weight of tools and materials you can carry, assuming no other load is on the platform?
  • Which hazard can result from operating an EWP in high winds?
  • If an EWP is in contact with powerlines and it is safe to do so, where should the operator remain?
  • What is one important reason for using the ground controls on an EWP?
  • Which group consists entirely of hazardous surface conditions for an EWP?
  • When should the chosen communication method be checked before EWP work?
  • Which item is a source of workplace safety information for EWP operations?
  • When pig-styling a second layer of packing, at what angle should it be placed relative to the first layer?
  • What is the main purpose of completing pre-start checks on an EWP?
  • Which two hazards may affect a person near an operating EWP?
  • Before an employee operates an unfamiliar EWP, what should the employer provide?
  • What is an appropriate check of an EWP’s liquid and battery levels?
  • Before positioning an EWP on a suspended concrete slab, what should be confirmed?
  • Which item is classified as the EWP’s dead load?
  • What must be provided when an elevated work platform is operated at night or in a darkened environment?
  • What does wind load refer to when operating an EWP?
  • What is the function of the EWP deadman control?
  • Which service history should be checked in an EWP logbook?
  • Which surface feature is a potential stability hazard for an EWP?
  • A person enters the EWP exclusion zone while work is underway. What should the operator do first?
  • Which stability-related hazard may occur when an EWP is operated in high winds?
  • Which consideration concerns how workers will exchange information during EWP operations?
  • Before an EWP that has contacted powerlines is used again, what must happen?
  • Why should an EWP be kept at a safe distance from a trench edge?
  • An EWP platform is rated for 300 kg. The operator weighs 92 kg, and materials weigh 118 kg. How much capacity remains for tools?
  • An EWP platform is rated for 300 kg. Two workers weigh 78 kg and 94 kg. How much capacity remains for tools and materials?
  • What is the minimum working distance from a powerline rated at 330 kV or above?
  • Which is an employer responsibility for workplace health and safety?
  • A platform has a rated capacity of 320 kg. The worker weighs 90 kg, and each crate weighs 23 kg. What is the maximum number of whole crates that can be carried?
  • Which is a visual indicator that overhead electrical lines may be present?
  • When planning work over a body of water from an EWP, which set of precautions is appropriate?
  • An EWP has a rated basket capacity of 250 kg. Two workers weigh 96 kg and 72 kg. What is the maximum gear weight they can carry without exceeding the rated capacity?
  • Which people and vehicles should be considered when planning an EWP boom path?
  • Why must EWP labels, decals, and signage remain readable?
  • Which environmental conditions should be considered when positioning an EWP near a building?
  • Which ground condition can adversely affect EWP stability?
  • An EWP has a rated capacity of 275 kg. The operator weighs 82 kg, and equipment on the platform weighs 64 kg. How much capacity remains for additional materials?
  • A platform is rated for 230 kg, and the operator weighs 87 kg. What is the maximum additional load that can be carried?
  • Which equipment is identified as mandatory while operating an EWP?
  • A worker weighing 106 kg is on a platform rated for 195 kg. With no other occupants or equipment, how much additional load can the platform carry?
  • When should hazard controls be applied during EWP work?